Aben Gold Provides Drill Program Update at Justin Gold-Tungsten Project

Markets GlobeNewswire By GlobeNewswire 01 Sep 2026 11:00 1 min read
Aben Gold Provides Drill Program Update at Justin Gold-Tungsten Project

Vancouver, BC, Sept. 01, 2026 (GLOBE NEWSWIRE) -- Aben Gold Corp. (TSX-V: ABM) (OTCID: ABNAF) (Frankfurt: ML1) (“Aben” or “the Company”) is pleased to provide an update on the fully funded 2026 diamond drill program at its 100%-owned Justin Gold-Tungsten Project in southeastern Yukon Territory, approximately 25 kilometres from the past-producing Cantung Mine. As of the August 30, 2026, daily field report, the Company has completed 766 metres of diamond drilling over 21 operating days, averagin

As of the August 30, 2026, daily field report, the Company has completed 766 metres of diamond drilling over 21 operating days, averaging 35.0 metres per day. A total of 785 core samples has been collected to date. The 2026 program is planned for approximately 1,300 metres.  Visual massive sulphides and ultraviolet indication of WO3. – see image 1 and 2.

First Hole Cut and Sent for Assay

Cutting of hole JN26-001 has been completed. The 341 samples from JN26-001 were dispatched on August 26, 2026, and submitted to Bureau Veritas for assay. Samples from JN26-002 (227 samples) and JN26-003 (217 samples) are being prepared for a subsequent dispatch.

Covered in this story

Read the full story on GlobeNewswire → Opens the original article on www.globenewswire.com

Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.