Azio AI Holdings Announces Atlas One, a 500+ Acre Site Designed for Up to 500 MW of Behind‐the‐Meter Power
Atlas One is the first named development phase within Project Atlas, bringing together the South Texas land, secured behind‐the‐meter natural gas generation, dedicated fiber and modular compute infrastructure AZIO has announced since May 2026. Approximately 6 MW of activated compute capacity at the site has operated at approximately 97.8% uptime.
Covered in this story
Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.