DalsnaFinance

VR completes 2,900 ft hole and polyphase vein intersection at its New Boston Moly-Tungsten-Copper-Silver Porphyry Project in Nevada; core scanning and continuous geochemistry are underway

Markets GlobeNewswire By GlobeNewswire 07 Jul 2026 11:00 1 min read
VR completes 2,900 ft hole and polyphase vein intersection at its New Boston Moly-Tungsten-Copper-Silver Porphyry Project in Nevada; core scanning and continuous geochemistry are underway

VANCOUVER, British Columbia, July 07, 2026 (GLOBE NEWSWIRE) -- VR Resources Limited (“VR” or the “Company”, TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF) is pleased to announce the successful completion of a 2,892 ft (881m) hole through continuous veining with sulfide at Jeep Mine on its New Boston moly-tungsten-copper-silver skarn and porphyry system located just off Highway 95 in west-central Nevada. Data and assays are pending from state-of-the-art hyperspectral scanning and continuous geochemical sa

VANCOUVER, British Columbia, July 07, 2026 (GLOBE NEWSWIRE) -- VR Resources Limited (“VR” or the “Company”, TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF) is pleased to announce the successful completion of a 2,892 ft (881m) hole through continuous veining with sulfide at Jeep Mine on its New Boston moly-tungsten-copper-silver skarn and porphyry system located just off Highway 95 in west-central Nevada. Data and assays are pending from state-of-the-art hyperspectral scanning and continuous geochemical sampling of the entire drill-hole intersection which are in progress at laboratories in Reno, Nevada.

Read the full story on GlobeNewswire → Opens the original article on www.globenewswire.com

Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.