NIOB Seigneurie Assays Confirm Niobium Mineralization in hole seven
Hole’s final assays return 842.3 ppm and 453 ppm niobium oxide over 10 and 7.3 metres plus 2,701.7 ppm copper over 3 metres Hole’s final assays return 842.3 ppm and 453 ppm niobium oxide over 10 and 7.3 metres plus 2,701.7 ppm copper over 3 metres
Hole’s final assays return 842.3 ppm and 453 ppm niobium oxide over 10 and 7.3 metres plus 2,701.7 ppm copper over 3 metres Hole’s final assays return 842.3 ppm and 453 ppm niobium oxide over 10 and 7.3 metres plus 2,701.7 ppm copper over 3 metres
Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.