Wallbridge Reports Latest Results from 2026 Martiniere Drill Program, Mineralization Continues to Expand Along Bug Lake Corridor
TORONTO, July 14, 2026 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) is pleased to announce assay results from the final four holes completed during the Phase 1 portion of its 2026 drilling campaign at its 100% owned Martiniere gold project (“Martiniere”). Phase 1 drilling was comprised of six holes focused on the Bug Lake deformation corridor, which hosts the majority of the Martiniere mineral resource.
TORONTO, July 14, 2026 (GLOBE NEWSWIRE) -- Wallbridge Mining Company Limited (TSX: WM, OTCQB:WLBMF) (“Wallbridge” or the “Company”) is pleased to announce assay results from the final four holes completed during the Phase 1 portion of its 2026 drilling campaign at its 100% owned Martiniere gold project (“Martiniere”). Phase 1 drilling was comprised of six holes focused on the Bug Lake deformation corridor, which hosts the majority of the Martiniere mineral resource.
Summary aggregated from GlobeNewswire's public RSS feed. The full reporting belongs to GlobeNewswire — please read it on their site.